Client Comment | | I had the privilege of spending the day with Armand yesterday. What a GREAT presentation! I really can’t say enough about how educational and enlightening it was. | | P. M. | | 12/16/2009 | Client Comment | | I’m a strong proponent of automation of spec writing. This program (HDP) has added a level of consistency that I was lacking before. It helps add some science to the balance between “art and science” that is part of being a Rehab Specialist. Yes, you have to figure out how to repair something the right way. You will always have scenarios that I call “head scratchers” when you tear apart an old house that has been remodeled or repaired insufficiently. But for all of the things that are simply quantitative take-offs, this is a seriously powerful tool. | | A. Y. | | 8/10/2011 |
|
|
|
| |
| Spec Cost Update Add-On |
|
| Q. |
Why is Bid History used to calculate my new unit costs? |
| A. |
New unit cost data is calculated based on bids you’ve received at the line-item level of detail because it ensures that the unit costs you’re using for your cost estimates are as accurate as possible for you. Unit costs should be a reflection of your community, your housing stock, and your contractors; this is an improvement upon regional cost data or even zip-code cost data because it is very specific to you.
Return to top |
| |
|
[-916249759]
|
| |
Don’t see an answer to your question? Ask us!
|